Field Proven Engineering Track Record (Estd. 2017)

Projects & Case Studies
Field Deployments, PCB Diagnostics & Client Success.

Explore documented field deployments, industrial automation footage, component-level PCB repair records, and verified engineering case studies across Nepal.

Multi-Year Field Deployments

In-Depth Case Studies

Detailed verification of our long-running institutional water automation and power protection projects.

Hospitality / Commercial Since April 2017 (9+ Yrs Uptime) NRs. 40,000+/mo Saved

Hotel Thamel Park

Thamel, Kathmandu • Foundational Deployment (April 2017 – Present)

Before Invento (The Problem)
  • Bought 4 to 6 emergency water tankers every month due to unpredictable overflow & depletion.
  • Suffered 2 costly pump motor burnouts in one year from dry-running during night water cuts.
  • Frequent guest complaints during peak morning tourist checkout hours.
Invento Engineering Solution
  • Turnkey installation of AquaGuard IPC STAR PRO dual-tank controller completed in 3 hours.
  • Hermetically sealed waterproof DC magnetic sensors deployed in underground sump & overhead tanks.
  • Integrated 170V–240V dynamic undervoltage trip & sub-2.0s dry-run safety lockout.
Verified Financial & Operational Results (Since April 2017 / 9+ Years)
NRs. 35,000 – 50,000 / mo
Saved on emergency water tankers (Over NRs. 400,000+ per year)
0 Motor Burnouts
Across 9+ consecutive years since April 2017 (Zero replacement costs)
30% Electricity Reduction
Through auto-timed pumping cycles without dry-draw friction

“We were the first client to use this product since April 2017; the system remains rock-solid, ensuring continuous water supply for our guests. Thanks to Invento for their dependable engineering support.”

— Management Team, Hotel Thamel Park
9+ Yrs
Continuous Uptime
NRs. 40K+/mo
Tanker Costs Cut
0 Failures
Since April 2017
Educational Campus 5+ Years Deployment 10,000L+ Water Saved/Yr

VVM School

Lalitpur, Harisiddhi • Campus Infrastructure

Before Invento (The Problem)
  • Manual caretaker switching failed repeatedly during peak morning assembly hours.
  • Overhead tanks overflowed daily, flooding corridors and wasting over 10,000 Liters annually.
  • Science laboratories ran dry unexpectedly mid-session.
Invento Engineering Solution
  • Deployed AquaGuard dual-sensor network with auto-refill threshold and upper overflow lockout.
  • Calibrated for heavy 8:00 AM – 10:00 AM school water consumption patterns.
  • Overhead tank overflow completely locked out via electrical safety isolation.
Verified Measured Results
10,000+ Liters / Year
Direct water conserved from overflow prevention
100% Caretaker Time Saved
Eliminated 60+ hours of manual pump monitoring per year
5+ Years Zero Failure
Zero board repairs or sensor fouling since deployment

“We are very happy! We save 10,000 liters of water per year from water wastage thanks to AquaGuard.”

— Administration, VVM School
5+ Yrs
Verified Deployment
10,000 L
Annual Water Saved
0 Leaks
Complete Overflow Lockout
Educational Campus Field Tested & Proven

Moonlight School

Kathmandu, Nepal

Challenge

Frequent electrical voltage dips caused repeated pump breakdowns, requiring costly rewiring and disrupting school operations.

Engineering

Integrated IPC STAR PRO featuring dynamic 170V–240V undervoltage protection and corrosion-free waterproof sensors.

Verified Result

Zero pump motor burnouts, complete liberation from manual switching, and smooth uninterrupted daily operations.

“It's very easy to use, and we are very happy to use this product. We are free from the responsibility to switch on and switch off manually.”

— Facilities Lead, Moonlight School
Field
Tested & Proven
Municipal Water Infrastructure Pump Control Evidence review required

Fully Automated Municipal Pump Control System

Challenge

Manual operation of multiple water pumps resulted in inconsistent water pressure, high energy waste, and frequent motor burnouts due to voltage fluctuations.

Engineering

We engineered a custom control panel integrating VFDs and PLCs. The system now automatically alternates pump loads, regulates pressure dynamically, and provides over-voltage protection, saving the client massive maintenance costs.

300+
Active Field Deployments
Estd. 2017
Kathmandu Engineering Lab
Within 24h
Working-Day Response (Sun–Fri)
30%
Avg. Electricity Bill Savings

Have a project or board to engineer?

Join our 100+ institutions and manufacturing clients across Nepal. Share your requirement or faulty board photo with our engineering team today.

Start Your Project WhatsApp Er. Krishna Shah